Lesson 11.5 · Formal Signoff on Real ProjectsThe signoff report
The signoff review is short if the plan was good. A one-page summary per block typically contains:
- Scope: configurations, RTL revision, tool and version.
- Results: assertions proven / bounded (with depth and justification) / waived (with reason and owner).
- Environment: assumptions with their references and where each is asserted.
- Quality: covers (all reachable, max depth), vacuity, mutation summary, COI/proof-core coverage with explained gaps.
- Bugs found: count, severity, and which were found by formal only.
- Open risks: anything the next level of verification must cover.
Chapter takeaways